Audi Q7 2007 !
6-cylinder TDI engine (3.0 ltr. 4-valve common rail), mechanics 01.2006
Repair Group 10 – Removing and installing engine
6
4
1 Removing and installing engine
♦ The engine is removed from underneath together with the
gearbox and subframe (with lock carrier installed).
♦ All cable ties which are released or cut open when remov-
ing must be fitted in the same position when installing.
♦ Collect drained coolant in a clean container for re-use or
disposal.
1.1 Removing engine
Special tools and workshop
equipment required
♦ Spring tensioner
-VW 552-
♦ Removal lever -80-200-
♦ Hose clamps for hoses
up to 25 mm Ø -3094-
♦ Used oil collection and
extraction unit
-V.A.G 1782-
♦ Hose clip pliers
-V.A.G 1921-
♦ Stepladder -VAS 5085-
10 – Removing and installing engine
Note
更多资料请访问深度汽车论坛 http://shenduauto.com/ 客服QQ:1398556747 电话:18218750259