Audi Q7 2007 !
6-cylinder TDI engine (3.0 ltr. 4-valve common rail), mechanics 01.2006
1 Removing and installing engine
31
6
– Attach the lifting tackle -3033- to engine lifting eyes and
workshop hoist -VAS 6100- with lift arm extension (work-
shop hoist) -VAS 6101- as shown in the illustration.
– Use workshop hoist to take up some of the weight of the
engine (do not lift).
– Remove support -VAS 6131/13-7- from engine.
– Lift off engine from engine cross member.
– Unscrew nuts -arrows- and detach bracket for connector
from engine support (left-side).
更多资料请访问深度汽车论坛 http://shenduauto.com/ 客服QQ:1398556747 电话:18218750259