Customer: Börger order confirmation no.:
Machine number: Type code:
Your project: Order number:
Commissioning date: Delivery date:
Test point
Carried out by:
(date/signature)
Checked by:
(date/signature)
1 Operating manual and appendices read and understood
2
Application data and operating parameters according to data
sheet correspond to application
3 Mounting rails fixed correctly to solid, even surface
4 Pre-tension of Multi Disc OK, protection cover installed
5
Pipes laid correctly on feed and discharge side, pipes fixed
and not leaking
6
Optional safety equipment installed correctly, connected and
functions checked
7
Electrical connections and grounding OK, direction of rotation
correct
8
Oil level in drive OK, transport lock removed from breather (if
present)
9 Fluid level in intermediate chamber OK, fill hole not closed
10 All valves in pipes opened; check valves installed correctly
11 Noise and vibration levels normal when drive is switched on
12 Pipes checked for leaks again with Bioselect switched on
13
Check of the flow rate and quality achieved and of the
working pressure
14
Current consumption of drive checked to guarantee correct
installation
15
Pre-tension and inlet pressure adjusted, break-in period suc-
cessfully completed
16
Maintenance and inspection intervals organized for the
machine
Appendix
BA-RC40_EN, 17.01.2024 www.boerger.de / www.boerger.com 187