5.7 Measures following on demand work!
Following completion of the work and before starting the unit,
carry out the following steps:
Be sure to read and follow all instructions:
— on safety,
— on operation and control,
— on installation, repairs and maintenance.
Ä
Chapter 2.12
“Safety instructions for maintenance and rectifying malfunc-
tions” on page 37
1. Check all screws that have been loosened previously for firm
seat.
2. Check whether all safety devices and covers that have been
removed previously are reinstalled properly.
3. Ensure that all tools, materials and other equipment used
have been removed from the work area.
4. Clean the work area and remove any spilled substances, e.g.
liquids, processing material or similar.
5. Reset the emergency stop devices, if required.
6. Confirm malfunctions at the control unit.
7. Ensure that nobody enters the hazardous area.
8. Ensure that all safety features of the unit function perfectly.
9.
Take the unit into operation again.
Ä
Chapter 5.3 “Contin-
uous operation” on page 99
Operation
BA-RC40_EN, 17.01.2024www.boerger.de / www.boerger.com108