NOTE!
Pre-tension adjustment
The pressure exerted on the Multi Disc is adjusted via the control
unit. Please observe the information in the BA-RC-Control oper-
ating manual.
4.5 Checks before commissioning
DANGER!
Risk of injury due to rotating parts!
Moving parts can cause severe injury.
Do not reach into rotating parts or handle rotating parts when
the machine is in operation.
Never open protective covers when in operation.
Perform work on the Börger machine only when stationary.
Observe the delay time: Prior to opening protective covers,
make sure that all components have stopped moving.
Shut down the machine and upstream and downstream
system components before carrying out any work on the
Börger machine or accessories.
Ä
Chapter 5.4 “Downtimes”
on page 100
The operating person is obligated to check that all safety
equipment is installed and fully functional before putting the
machine into operation.
The Börger machine must only be switched on when the inlet
and outlet connections have been established and the mainte-
nance openings have been securely installed.
Transportation, Storage and Installation
BA-RC40_EN, 17.01.2024 www.boerger.de / www.boerger.com 87