SECTION 6 CESSNA
WEIGHT
&
BALANCEIEQUIPMENT LIST MODEL 2088 (675 SHP)
OFF
LOAD SEQUENCE
REQD. REQD. REQD. REQD.
I.
ZyE
4
ZONE
4
ZYE
4
ZONE
4
CARGO
I
POD
NOTE
1. If cargo partitions are not utilized, individual loads must be
secured
by
adequate tie-downs over tarps.
2.
Protection against hazardous materials nas been provided in
the fuselage bilge area under the cargo compartment from
station 168 to 356. These materials can be carried in any
location within this area.
Figure 6-13.
Loadingrie-Down
By
Zone And Load
(Off-Loading Sequence)
1
6-42 U.S. Revision 23