Index
IN-17
Software Configuration Guide—Release IOS XE 3.3.0SG and IOS 15.1(1)SG
OL-23818-01
definition 66-1
ICMP echo operation 66-11
manually configuring CFM ping or jitter 63-19
measuring network performance 66-3
multioperations scheduling 66-5
operation 66-3
reachability tracking 57-9
responder
described
66-4
enabling 66-7
response time 66-4
scheduling 66-5
SNMP support 66-2
supported metrics 66-2
threshold monitoring 66-6
track state 57-9
UDP jitter operation 66-8
IP Source Guard
configuring
50-20
configuring on private VLANs 50-22
displaying 50-22, 50-23
overview 50-23
IP statistics
displaying
33-8
IP traceroute
executing
8-10
overview 8-9
IP unicast
displaying statistics
33-8
IP Unnumbered support
configuring on a range of Ethernet VLANs
16-5
configuring on LAN and VLAN interfaces 16-4
configuring with connected host polling 16-6
DHCP Option 82 16-2
displaying settings 16-7
format of agent remote ID suboptions 16-2
troubleshooting 16-8
with conected host polling 16-3
with DHCP server and Relay agent 16-2
ip unreachables command 8-13
IPv4, IPv6, and MAC ACLs, configuring on a Layer 2
interface
51-29
IPv6
addresses
52-2
default configuration 52-7
defined 1-17, 52-1
Enhanced Interior Gateway Routing Protocol (EIGRP)
IPv6
52-6
Router ID 52-6
OSPF 52-6
IPv6 control traffic, policing 48-16
IPX
redistribution of route information with EIGRP
1-15
is 27-19
ISL
trunking with 802.1Q tunneling
27-4
isolated port 42-4
isolated VLANs 42-2, 42-3, 42-4
ISSU
compatibility matrix
5-14, 6-13
compatiblity verification using Cisco Feature
Navigator
5-15, 6-14
NSF overview 5-3, 6-3
perform the process
aborting a software upgrade
5-31, 6-31
configuring the rollback timer as a
safeguard
5-32, 6-32
displaying a compatibility matrix 5-34, 5-37, 6-34
loading the new software on the new
standby
5-24, 6-24
stopping the rollback timer 5-23, 6-23
switching to the standby 5-21, 6-21
verify the ISSU state 5-17, 6-17
verify the redundancy mode 5-16, 6-16
verify the software installation 5-16, 6-15
vload the new software on standby 5-18, 6-18
prerequisites 5-2, 6-2
process overview 5-6, 6-6
restrictions 5-2, 6-2