. . . . .
SAFETY INFORMATION
Remove Lock-Out Tag Out Devices
2-9317-372-00-0 Bravo™ 8105 Programming and Operations Guide 1-17
Remove Lock-Out Tag Out Devices
Introduction Prior to removing the Lock Out device and resuming system operation, ensure the
following is complete:
• Perform and complete each scheduled maintenance, installation, upgrade, or
repair task
• Replace any worn parts, if replacement is required
• Complete all required cleaning steps, if cleaning is required
• Replace all enclosures removed during maintenance, installation, upgrade, or
repair procedures
• Latch or appropriately tighten down all enclosures removed during
maintenance, installation, upgrade, or repair operations
Safety To ensure personal safety and avoid equipment damage, observe the following:
CAUTION
If items removed during maintenance, installation, upgrade, or repair procedures
are not properly replaced, damage to the equipment can occur.
ATTENTION
The person who attaches a lock-out device is responsible to remove the device.
Procedure Use the following steps to remove facility and Bravo™ machine lock-out and tag-
out devices:
1. Notify all affected employees.
2. Locate and remove the lock-out device from the facility main power source.
3. Turn the facility main power source to the On position.
4. Locate and remove the lock-out device from the rear of the machine.
5. Place the Main Power Disconnect in the On position.
6. Resume normal system operation. For detailed information refer to the Bravo™
Programming and Operations Guide.