Mounting ProlineйPromagйHй100йEtherNet/IP
24 Endress+Hauser
ййA0002651
7 Installing grounding rings
1 Hexagonal-headed bolts of process connection
2 O-ring seals
3 Grounding ring or plastic disk (spacer)
4 Sensor
1. Releaseйtheй4йorй6йhexagonal-headedйboltsйс1)йandйremoveйtheйprocessйconnection
fromйtheйsensorйс4).
2. Removeйtheйplasticйdiskйс3),йalongйwithйtheйtwoйO-ringйsealsйс2),йfromйtheйprocess
connection.
3. PlaceйtheйfirstйO-ringйsealйс2)йbackйintoйtheйgrooveйofйtheйprocessйconnection.
4. Fitйtheйmetalйgroundingйringйс3)йinйtheйprocessйconnectionйasйillustrated.
5. PlaceйtheйsecondйO-ringйsealйс2)йintoйtheйgrooveйofйtheйgroundingйring.
6. Mountйtheйprocessйconnectionйbackйonйtheйsensor.йInйdoingйso,йmakeйsureйyouйcomply
withйtheйmax.йscrewйtighteningйtorquesйforйlubricatedйthreads:й7йNmйс5.2йlbfйft)
6.2.4 Turning the display module
Theйdisplayйmoduleйcanйbeйturnedйtoйoptimizeйdisplayйreadability.