GE Power Management 745 Transformer Management Relay 6-21
6 ACTUAL VALUES 6.7 SELF-TEST ERRORS
6
6.7 SELF-TEST ERRORS 6.7.1 DESCRIPTION
The 745 performs self-diagnostics at initialization (after power-up), and continuously thereafter (in a back-
ground task). The tests ensure that every testable unit of the hardware is functioning correctly.
ANY SELF-TEST ERROR INDICATES A SERIOUS PROBLEM REQUIRING SERVICE.
6.7.2 MAJOR SELF-TEST ERRORS
Upon detection of a major self-test error, the 745:
• disables all protection functionality
• turns on the front panel SELF-TEST ERROR indicator
• turns off the front panel IN SERVICE indicator
• de-energizes all output relays, including the SELF-TEST relay
• indicates the failure by inserting an appropriate message in the target message queue
• records the failure in the EVENT RECORDER
6.7.3 MINOR SELF-TEST ERRORS
Upon detection of a minor self-test error, the 745:
• turns on the front panel SELF-TEST ERROR indicator
• de-energizes the SELF-TEST relay
• indicates the failure by inserting an appropriate message in the target message queue
• records the failure in the EVENT RECORDER
All conditions listed in Table 6–3: SELF-TEST ERROR INTERPRETATION cause a target message to be gen-
erated.
CAUTION

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE 745 TRANSFORMER MANAGEMENT RELAY and is the answer not in the manual?

GE 745 TRANSFORMER MANAGEMENT RELAY Specifications

General IconGeneral
BrandGE
Model745 TRANSFORMER MANAGEMENT RELAY
CategoryRelays
LanguageEnglish

Related product manuals