GE MEDICAL SYSTEMS
D
IRECTION FK091075, REVISION 04 VIVID 3N PRO/EXPERT SERVICE MANUAL
8-34 Section 8-3 - Control Console Components Replacement
8-3-2-5 Installing a New VIC Correlation Box (cont’d)
8.) Fasten the VIC assembly to the metal frame, using the two screws removed in step 3.
9.) Fasten the upper back-end BEP bracket in position, using the two screws removed in step 2.
10.)Reassemble the side covers - see 8-2-2-4 "Side Covers Installation Procedure" on page 8-4
11.)Check that all covers are fixed firmly in position.
For the next stage of the new monitor installation procedure, proceed to the instructions for 6-7-2 "Image
Quality Calibration for the Vivid 3N 17" Monitor" on page 6-20.
Figure 8-35 VIC Correlation Module in Position