EasyManua.ls Logo

GE Vivid E9 - Page 468

GE Vivid E9
802 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE H
EALTHCARE
D
IRECTION
GA091568, R
EVISION
5 VIVID E9 S
ERVICE
M
ANUAL
8 - 134 Section 8-6 - Top Console Parts Replacement
8-6-19-3 Lower Switch Board with Elastomer installation
1.) Verify that all switch cups are in their correct positions.
2.) Position the Lower Switch Board with Elastomer in its correct position.
3.) Install the 26 fixing screws.
4.) Connect the cable to the Encoder Board.
5.) Install the Trackball.
6.) Install the Operator Panel, Lower.
7.) Install the Operator Panel, Upper.

Table of Contents

Other manuals for GE Vivid E9

Related product manuals