EasyManua.ls Logo

GE Voluson P6 - 5-15-1-4 Memtest(Memory Check)

GE Voluson P6
620 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE RAFT VOLUSON™ P8/VOLUSON™P6
DIRECTION 5775469, R
EVISION 3 DRAFT (JULY 19, 2018) BASIC SERVICE MANUAL
5-62 Section 5-15 - Boot Screen Functions
5-15-1-4 Memtest(Memory Check)
1.) Turn system OFF and then back ON.
2.) As soon as the “Boot Screen” appears (see: Figure 5-33 on page 5-60), press the PG DN
[ Arrow down] key on the keyboard until the Rollback item is highlighted, then press ENTER.
3.) The PC Memory Test will start automatically and will take about 2.5 hours. If there are errors they
will be listed.
NOTE: After one cycle(~2.5 hours) the memory check starts again. To interrupt the test, press the Ctrl + Alt +
Del key. If you don’t interrupt the memory test, it will perform never ending cycles of memory checks.
NOTE: If after one cycle (about 2.5 hours), no error messages are listed, it can be assumed that the Back End
Processor including power supply is working properly.
CAUTION
After 3 sec. without pressing any key, the system will boot-up in windows (= Voluson item).
If you missed step 2, retry again with CTRL + ALT + DEL.
Figure 5-35 Memory check in LINUX

Table of Contents

Other manuals for GE Voluson P6

Related product manuals