EasyManua.ls Logo

GE Voluson P6 - Section 8-54 Functional Checks after FRU replacement (Debrief Guidelines)

GE Voluson P6
620 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE RAFT VOLUSON™ P8/VOLUSON™P6
DIRECTION 5775469, R
EVISION 3 DRAFT (JULY 19, 2018) BASIC SERVICE MANUAL
8-168 Section 8-54 - Functional Checks after FRU replacement (Debrief Guidelines)
Section 8-54
Functional Checks after FRU replacement (Debrief Guidelines)
1.) Perform required Functional and/or Leakage Current tests based upon the FRU being replaced.
2.) Clarify the scripts to debrief a Service Dispatch using your pole's dispatch tool.
Use this script in the Service Comments when debriefing a Service Dispatch.
For a replaced FRU, use the following debrief script:
Proprietary Service Manual, DIRECTION 5775469,Revision 3 , Section [ Section 10-6 "System
Maintenance" on page 10-8]. Equipment passed all required tests and is ready for use.
And, if testing leaking current, use the following text.
Proprietary Service Manual, Voluson™ P8/Voluson™P6, Revision Voluson™ P8/Voluson™P6,
Section [ Section 10-8 "Electrical Safety Tests" on page 10-14]. Leakage Current meets allowable
limits. Equipment passed all required tests and is ready for us.

Table of Contents

Other manuals for GE Voluson P6

Related product manuals