EasyManua.ls Logo

GE Voluson P6 - Section 8-48 Replacement of the DBP; 8-48-1 Manpower; 8-48-2 Tools; 8-48-3 Preparations

GE Voluson P6
620 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE RAFT VOLUSON™ P8/VOLUSON™P6
DIRECTION 5775469, R
EVISION 3 DRAFT (JULY 19, 2018) BASIC SERVICE MANUAL
8-144 Section 8-48 - Replacement of the DBP
Section 8-48
Replacement of the DBP
8-48-1 Manpower
One person, 30 minutes
8-48-2 Tools
Philips screwdriver, Allen Wrench
8-48-3 Preparations
1.) Power Off/Shutdown the system as described in 4-3-2 on page 4-4.
2.) Pull out the NEST as described in Section 8-28 "Replacement of the NEST" on page 8-93.
8-48-4 Removal Procedure
1.) Remove the CSI. Refer to Section 8-47 "Replacement of the CSI" on page 8-143
2.) Remove fan connector and unscrew 8 screws.
Figure 8-205 Removing fan connector and unscrewing 8 screws

Table of Contents

Other manuals for GE Voluson P6

Related product manuals