EasyManua.ls Logo

GE Voluson P6 - Section 8-58 Replacement of Battery Pack Assy; 8-58-1 Manpower; 8-58-2 Tools; 8-58-3 Preparation

GE Voluson P6
620 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE DRAFT VOLUSON™ P8/VOLUSON™P6
DIRECTION 5775469, R
EVISION 3 DRAFT (JULY 19, 2018) BASIC SERVICE MANUAL
Chapter 8 - Replacement Procedures 8-179
Section 8-58
Replacement of Battery Pack Assy
8-58-1 Manpower
One person, 20 minutes
8-58-2 Tools
Philips screwdriver
8-58-3 Preparation
Power Off/Shutdown the system as described in 4-3-2 on page 4-4.
8-58-4 Removal procedure
1.) Follow the removal procedure of Section 8-41 "Replacement of the DPS/DPS with Battery" on page
8-128.
2.) Unscrew 14 screws and remove DPS with Battery cover.
Figure 8-257 Removing DPS with Battery cover

Table of Contents

Other manuals for GE Voluson P6

Related product manuals