EasyManua.ls Logo

GE Voluson P6 - Section 8-42 Replacement of the DRFG; 8-42-1 Manpower; 8-42-2 Tools; 8-42-3 Preparations

GE Voluson P6
620 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE DRAFT VOLUSON™ P8/VOLUSON™P6
DIRECTION 5775469, R
EVISION 3 DRAFT (JULY 19, 2018) BASIC SERVICE MANUAL
Chapter 8 - Replacement Procedures 8-129
Section 8-42
Replacement of the DRFG
8-42-1 Manpower
One person, 30 minutes
8-42-2 Tools
Philips screwdriver, Allen Wrench
8-42-3 Preparations
1.) Power Off/Shutdown the system as described in 4-3-2 on page 4-4.
2.) Remove the REAR CABINET BEZEL ASSY BT16s and disconnect cables as described in 8-28-4
"Removal Procedure" 2), 3), 4) and 7) on page 8-93.
3.) Remove the NEST EMI BRKT BT16 as described in 8-56-4 "Removal Procedure"

Table of Contents

Other manuals for GE Voluson P6

Related product manuals