170
Index
A C D E F G H I L M N O P R S T W
A
AC power cable,127
Ac
cessing the IRF virtual device to verify the
configuration,51
Air
filter,123
At
taching an ESD-preventive wrist strap,27
C
Ca
ble management requirements,156
CF car
d,124
Con
cepts,53
Co
nfiguring a software exception handling method,80
Co
nfiguring basic IRF settings,50
Co
nnecting the PGND cable,23
Co
nnecting the physical IRF ports,50
Co
nnecting the switch to the network,64
Co
rrect use of labels,15 6
D
Display
ing information about the switch,66
Display
ing IRF information,81
E
Env
ironmental specifications,111
Ethern
et twisted pair cable,149
Examining the
installation site,6
F
Fan
tray,122
G
Gener
al cabling requirements,156
H
He
at dissipation,111
I
Initia
lly configuring the switch,61
Inspectin
g the switch,13
Installati
on flow,12
Installing a ca
rd,28
Installing a CF ca
rd to the SRPU (optional),45
Installing a pow
er module,29
Installing a tra
nsceiver module (optional),46
Installing acces
sories to the chassis,18
Install
ing IRF member switches,50
Installing slid
e rails and cage nuts to the rack,13
IR
F virtual device setup flowchart,48
L
Lo
gging in to the switch for the first time,54
LPU
,115
LPU LEDs
,139
M
Modu
le power consumption and total power
consumption,108
Mo
un
ting the switch to the rack,22
N
Nois
e,112
O
Optical f
iber,153
Over
view,1
P
Phy
sical architecture,2
Planning IRF v
irtual device setup,49
PoE
DIMM,123
Po
rt configuration and management,77
Pow
er module,12 0
Po
wer module LEDs,141
Prer
equisites,48
R
Re
booting a card or the switch,84
Re
gulatory Compliance Information,160
Re
gulatory compliance statement,16 0
Re
placing a card,94
Re
placing a CF card,100
Re
placing a fan tray,95