12
Installing the switch
This chapter includes these sections:
Installation flow
Inspecting the switch
Installing slide rails and cage nuts to the rack
Installing accessori
e
s to the chassis
Mounting the switch to the rack
Connecting the PGND cable
IMPORTANT:
Keep the packages of the switch and the components for future use.
Installation flow
Figure 5 Installation flow
Start
Check before
installation
Install slide rails and cage
nuts to the rack
Install accessories to the
chassis
Install the switch
to the rack
End
Connect the PGND cable
Table 7 Description on the installation flow
Step Remarks
Inspecting the switch Preparations before installation
Installing slide rails and
cage nuts to the rack
For how to install slide rails, see “Installing slide rails.”
For how to install cage nuts, see “Installing cage nuts for mounting brackets.”

Table of Contents

Other manuals for H3C S7500E Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the H3C S7500E Series and is the answer not in the manual?

H3C S7500E Series Specifications

General IconGeneral
BrandH3C
ModelS7500E Series
CategorySwitch
LanguageEnglish

Related product manuals