Replacing the Controller Module 
Removing and replacing the Controller Module requires that that the source of AC power is removed from 
the rack.  Removing power from the Controller rack has the following consequences: 
  All control action stops 
  All power to all I/O modules in the rack is lost; hence all control outputs to the process are lost.  Because 
external power connected to terminal boards (from or to field devices) will still be present, it is essential 
that field devices are maintained in a safe condition during replacement procedures.  
  Control to all I/O expansion racks is lost.  If power is available to the expansion racks, outputs go to 
configured Failsafe values. 
C75 module 
  Does not impact the other C75 CPU module, which will continue to control the process 
  Contains start-up diagnostics after replacement to verify proper operation 
  If there is a Lead Controller, the configuration database is automatically copied from the Lead to the 
newly replaced C75 CPU module. 
Before replacement: 
  (If possible), upload and SAVE a copy of the configuration, or ensure that a previously saved copy of the 
current configuration is available.  
  (If possible), bring the process to a safe and orderly shutdown.   
Table 35 – Controller Module Replacement 
If a process is currently in operation, bring it to a safe and orderly shutdown.  
Using an external (user-supplied) switch, disconnect the power supply in the Controller rack from the 
site AC power source.  
Observe where communications cables are plugged into the Controller Module, and if necessary, tag 
them to identify their functions.  Unplug all communications cables. 
At the top and bottom of the module, loosen the captured screws that secure the module in the rack, 
and remove the Controller Module from the rack.  
Ensure that you set the S1, S2, and RS-485 terminal dip switches as applicable. 
Ensure that the new Controller Module is properly aligned with the slot guides, insert the new Controller 
Module in the rack, and secure it in place with the captured screws at top and bottom of the module. 
Re-install communications cables. 
Using the (user-supplied) switch, re-connect site AC power to the rack. 
If using the Ethernet port for configuration, use the Designer software to set the proper network 
address. 
Download the configuration. 
If all status indications are green, power may be restored to the I/O modules per the application's 
procedures.