Revision 6    HC900 Process & Safety Controller User and Installation Manual  73 
21 April 2017 
Table 10 – Assemble C75 Controller Rack 
Carefully place the Power 
Supplies in the slots in the 
Rack, ensuring that the 
connector at the back seats 
properly. See Table 9 steps 1 
and 2 for power supply wiring 
details.  
Note: It is recommended each 
power supply should be 
powered from a separate 
power source and a power 
switch should be installed to 
allow for servicing of each 
Processor/Supply separately.  
Set controller communication 
ports. 
   
Ensure that AC power to the 
rack is disconnected. 
Carefully place the Controller 
Modules in the rack, adjacent 
to the Power Supplies.  
Fasten them in place with 
captured screws at top and 
bottom.  
Torque to 0,4 -0,5 N.m  
(3.5 – 4.4 Lb-In). 
ATTENTION: 
The CPU battery comes 
installed with a plastic tab 
protruding from the battery 
cover. This tab breaks the 
battery circuit. Do not 
remove this tab at this time. 
Removing the tab before 
the controller is configured 
can substantially shorten 
battery life. Remove the tab 
under power after the 
controller configuration is 
complete. 
(For more information, refer to 
Battery 
Installation/Replacement, 
page 203.) 
Insert the RSM in the middle 
slot and attach with screws at 
top and bottom.