EasyManua.ls Logo

Honeywell HC900 - Terminal Block Styles; Terminal Block Colors and Keying

Honeywell HC900
274 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
66 HC900 Process & Safety Controller User and Installation Manual Revision 6
21 April 2017
Equipment Preparation
A checklist for site preparation is given in Table 7.
Table 7 Site and Equipment Preparation
Step
Procedure
Reference
1
Verify that sufficient numbers of the following items are on
hand:
Racks (4-, 8- and 12-slot)
Power Supplies: 1 per rack or 2 per rack if redundant
powered rack.
C30/C50/C70 Controller Module or Scanner 1 port (1 per
rack)
Redundancy:
Each Controller Rack: 2 Power Supplies, 2 C75 CPUs,
1 Redundancy Switch Module.
Each I/O Rack: 1 Scanner dual-port module, 1 Power
Supply, 1 reserve Power Supply (optional), 1 Power
Status Module (optional)
I/O Modules (correct type for each configured slot)
Terminal Blocks, Barrier or Euro style, (1 for each I/O
Module)
Jumpers 2-position or 10-position, (for designated
Terminal Blocks)
Tie Wraps (1 or 2 for each Terminal Block)
I/O Label (one per terminal block, by module type)
Filler Block Cover (1 for each slot not occupied by an
I/O Module)
Blank label (1 for each Filler Block Cover)
Grounding Bars for I/O wiring shields (1 or 2 for each 4-
slots in each rack)
Wiring terminal lugs (for connecting I/O shields to
grounding bars)
Sheet metal screws, steel #10 or M4, for mounting racks
in enclosures (4 screws for 4-slot racks, 8 screws for 8- or
12-slot racks)
Section on Pre-Installation
Planning.
Sections on installation

Table of Contents

Other manuals for Honeywell HC900

Related product manuals