Figure 3-32 Removing a server from holding rails
4. Place the removed server onto an ESD platform.
Step 5 Remove the front end of the holding rail.
1. Hold down the plate on the front end of the holding rail and pull out the
hook. See (1) and (2) in Figure 3-33.
RH2288H V3 Server
User Guide 3 Installing and Removing the RH2288H V3
Issue 46 (2022-12-28) Copyright © Huawei Technologies Co., Ltd. 113