4 - HANDLING AND INSTALLATION BOSS 332/545/552 HD
EN
4 - Pag. 11 / 32
4.4.5 Levelling and alignment
FOREWORD
Alignment between the bar feeder and lathe is the
most critical installation phase; therefore, this
operation should be carried out by experienced
personnel with the greatest accuracy.
WARNING – CAUTION:
an error during the alignment may be
the major cause of a bad operation of
the bar feeder and of its consequent
damage.
PRELIMINARY PROCEDURE
• Open the upper guard.
• Open rear guard "A".