EasyManua.ls Logo

IEMCA BOSS 545 E - Page 64

Default Icon
211 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 - HANDLING AND INSTALLATION BOSS 332/545/552 HD
EN
4 - Pag. 11 / 32
4.4.5 Levelling and alignment
FOREWORD
Alignment between the bar feeder and lathe is the
most critical installation phase; therefore, this
operation should be carried out by experienced
personnel with the greatest accuracy.
WARNING – CAUTION:
an error during the alignment may be
the major cause of a bad operation of
the bar feeder and of its consequent
damage.
PRELIMINARY PROCEDURE
Open the upper guard.
Open rear guard "A".

Table of Contents

Related product manuals