4.5.3 Preliminary positioning
• Position the bar feeder behind the lathe, by
taking into account the fixed dimensions and
side plays of both machines and the coupling
distance (see "B" in the "PRELIMINARY
POSITIONING" section, Ch. 4)
• Roughly adjust the working axis height to obtain
alignment with the lathe by turning the feet
screws.
• Place four plates under the axial displacement
sliding frame in the positions shown in the
figure, and screw down the cone end grub
screws "A".
• Check frame levelling crosswise and lengthwise;
adjust if required by acting on screws "A".
• Roughly restore working axis height and
alignment with the lathe if required.