Site Preparaon Checklist for an EX4600 Switch
The checklist in Table 18 on page 42 summarizes the tasks you need to perform when preparing a site
for EX4600 switch installaon.
Table 18: Site Preparaon Checklist
Item or Task For More Informaon Performed By Date
Environment
Verify that environmental factors such as
temperature and humidity do not exceed
switch tolerances.
"Environmental Requirements
and Specicaons for EX Series
Switches" on page 44
Power
Measure the distance between external
power sources and switch installaon
site.
Calculate the power consumpon and
requirements.
"AC Power Specicaons for an
EX4600 Switch" on page 32
Rack or Cabinet
Verify that your rack or cabinet meets the
minimum requirements for the
installaon of the switch.
"Rack Requirements for an
EX4600 Switch" on page 52
"Cabinet Requirements for an
EX4600 Switch" on page 54
Plan rack or cabinet locaon, including
required space clearances.
"Clearance Requirements for
Airow and Hardware
Maintenance for an EX4600
Switch" on page 56
Secure the rack or cabinet to the oor
and building structure.