Figure 23: Typical Open-Frame Rack
Related
Documentation
M120 Clearance Requirements for Airflow and Hardware Maintenance on page 85•
• Installing the Mounting Hardware for a Center-Mount Open-Frame Rack on page 123
• Installing the Mounting Hardware for a Front-Mount Four-Post Rack or Cabinet on
page 119
• Installing the Mounting Hardware for a Front-Mount Open-Frame Rack on page 121
• Installation Safety Warnings for Juniper Networks Devices on page 322
• Installing the M120 Router Without Using a Mechanical Lift on page 139
M120 Clearance Requirements for Airflow and Hardware Maintenance
When planning the installation site, you need to allow sufficient clearance around the
rack (see Figure 24 on page 86):
•
For the cooling system to function properly, the airflow around the chassis must be
unrestricted. Figure 7 on page 20 depicts the airflow in the router.
85Copyright © 2018, Juniper Networks, Inc.
Chapter 9: Preparation Overview