CHAPTER 15
Unpacking the M120
•
Tools and Parts Required to Unpack the M120 Router on page 113
•
Unpacking the M120 Router on page 113
•
Verifying M120 Parts Received on page 115
Tools and Parts Required to Unpack the M120 Router
To unpack the router and prepare for installation, you need:
•
Phillips (+) screwdriver, number 2
•
1/2-in. or 13-mm open-end or socket wrench to remove bracket bolts from the shipping
pallet
•
Blank panels to cover any slots not occupied by a component
Related
Documentation
M120 Router Chassis Description on page 7•
• M120 Router Installation Summary on page 111
• M120 Site Preparation Checklist on page 81
Unpacking the M120 Router
The router is shipped in a cardboard box strapped securely to a wood pallet. Plastic
straps secure the top and bottom in place. The router chassis is bolted to this pallet.
Quick Start installation instructions and a cardboard accessory box are also included in
the shipping container.
The shipping container measures 32.5 in. (82.6 cm) high, 35 in. (88.9 cm) wide, and
27 in. (68.6 cm) deep. The total weight of the container containing the router and
accessories can range from 149 lb (63.5 kg) to 280 lb (127 kg).
NOTE: The router is maximally protected inside the shipping crate. Do not
unpack it until you are ready to begin installation.
To unpack the router, (see Figure 28 on page 115):
113Copyright © 2018, Juniper Networks, Inc.