Table 10: Site Preparation Checklist for Services Gateway
Installation (continued)
NotesDatePerformed By
Additional
InformationItem or Task
“SRX100
Services
Gateway Site
Electrical Wiring
Guidelines” on
page 29
“SRX100
Services
Gateway Power
Specifications
and
Requirements”
on page 31
Measure the distance
between the external
power sources and
the device installation
site.
Locate sites for
connection of system
grounding.
Calculate the power
consumption and
requirements.
Rack Requirements
“SRX100
Services
Gateway Rack
Requirements”
on page 26
Verify that your rack
meets the minimum
requirements.
Rack Installation
“Preparing the
SRX100
Services
Gateway for
Rack-Mount
Installation” on
page 47
Plan the rack location,
including required
space clearances.
Secure the rack to the
floor and building
structure.
Cabinet Requirements
“SRX100
Services
Gateway
Cabinet
Requirements”
on page 25
Verify that your
cabinet meets the
minimum
requirements.
Plan the cabinet
location, including
required space
clearances.
Wall Installation