Table 10: Site Preparation Checklist for Services Gateway
Installation (continued)
NotesDatePerformed By
Additional
InformationItem or Task
“Preparing the
SRX100
Services
Gateway for
Wall-Mount
Installation” on
page 48
•
Verify that the area
selected meets the
minimum
requirements.
•
Verify that you have
the required hardware
to proceed with the
installation.
Desktop Installation
“Preparing the
SRX100
Services
Gateway for
Desk-Mount
Installation” on
page 48
•
Verify that the area
selected meets the
minimum
requirements.
•
Plan the installation
location, including
required space
clearances and
airflow requirements.
Cables
“Interface Cable
and Wire
Specifications
for the SRX100
Services
Gateway” on
page 33
•
Acquire cables and
connectors.
•
Review the maximum
distance allowed for
each cable. Choose
the length of cable
based on the distance
between the
hardware
components being
connected.
•
Plan the cable routing
and management.
Related
Documentation
SRX100 Services Gateway Specifications on page 24•
• SRX100 Services Gateway Safety Requirements, Warnings, and Guidelines on page 121
• Installation Overview for the SRX100 Services Gateway on page 40
• General Site Guidelines for Installing the SRX100 Services Gateway on page 24
• SRX100 Services Gateway Cabinet Requirements on page 25
• SRX100 Services Gateway Rack Requirements on page 26
• Clearance Requirements for Airflow and Hardware Maintenance of the SRX100 Services
Gateway on page 27