2MV
1-2-24
18. Pass the key counter wire through the
wire saddle B and the wire saddle C
and then pull out from the aperture part.
19. Pass the key counter wire through the
edging.
Note: Put a binding band on the front
side of the wire saddle C.
Figure 1-2-32
20. Pass the connector of the key counter
wire from Below through the aperture in
the controller box and then connect to
the connector (YC24) of the video
PWB.
21. Fix the key counter wire using nine wire
saddle A.
Note: When a key counter electric wire
slackens, bundle and fix to X position.
Figure 1-2-33
Connector
Wire saddle B
Wire saddle C
Edging
Key counter wire
binding band
Aperture
Wire saddle A
Wire saddle A
Wire saddle A
Control box aperture
Connector
(YC24)
Key counter wire
X