6 OPERATION
LACO Technologies TITAN VERSA Operations and Maintenance Manual 105
Turbo Pump
The Turbo pump screen summarizes key pump performance data as shown below.
This information can aid in troubleshooting.
Pirani Calibration
The Pirani vacuum gauge sensor should be calibrated every six months. The calibration
process had two main steps:
• Atmosphere reading
• Deep Vacuum reading (take 3-5 minutes to ensure deep vacuum has been
reached).