Installation and User Manual
16
3.
SHIPPING AND STORAGE
3.1
General Warnings
3.1.1
Personal Protection Equipment (PPE)
The operators assigned to the transport, storage and installation of the P3UP must be provided with and use
the PPE indicated in section 0, as well as the obligatory PPE for the environment that the P3UP is used in.
3.1.2
Training
The operators assigned to the transport, storage and installation of the P3UP must be trained and informed
as required by the applicable directives in the respective countries.
3.1.3
State of the work equipment
To perform the transport, storage and installation operations the operators must use the equipment listed in
the relevant sections.
The work equipment must be in a good state, especially in terms of wear, age and fatigue.
The equipment must be selected based on the legal requirements in terms of work equipment and must be
used in compliance with the manufacturer's requirements.
3.1.4
Moving loads
When moving loads the operators must pay the utmost attention in order to avoid dangerous movements that
could generate dangerous situations for themselves and for the people exposed in the danger zone.
The movement operations must be performed in compliance with the instructions of the lifting equipment
used.
3.1.5
Receiving the material
During packing all the P3UP's technical material is thoroughly checked in order to avoid shipping damaged
material.
When unpacking the material check that the P3UP is perfectly intact and is not damaged: if it is contact
Marposs immediately.