© 2014 MIMAKI ENGINEERING CO.,LTD. 6.2.12 P.6
6.2.12 Changing Joint
1
2
3
4
5
6
7
8
6. Connect the circulation path of the white ink and silver ink of
the carriage side.
Fittings of the circulation path
Release
1-7
2-7
1-8
2-8
For the connection of the circulation route, refer
to the following.
・Dotted line in orange: Connect to 1-7 and 2-7,
・Solid line in orange: Connect to 1-8 and 2-8
(In case of 150 series, connect to 1-7 and 1-8.)
In order to prevent ink leakage during
connection of the fitting, be careful to:
・check that the tabs on both its sides fit firmly
in, and
・fix it in place with the cable tie
(RERELK2R_release tie).
Dotted line in orange :
Connect to 1-8 and 2-8
Solid line in orange :
Connect to 1-8 and 2-8
Capable of unlocking
15mm
Cable tie
For the tube tag, refer to the following.
[300 series]
[150 series]
1-2
1-1
1-8
1-6
1-7
1-4
1-5
1-3
2-2
2-1
2-8
2-6
2-7
2-4
2-5
2-3
R.1.0
MAINTENANCE MANUAL > Disassembly and Reassembly > Ink-related Parts > Changing Joint
Model
CJV150/300
Issued
2014.09.15
Revised F/W ver
1.00
Remark
1.0