© 2014 MIMAKI ENGINEERING CO.,LTD.
6.3.10 P.1
1
2
3
4
5
6
7
8
R.1.0
MAINTENANCE MANUAL > Disassembly and Reassembly > Drive System > P Head Connecting Hook
Model
CJV150/300
Issued
2014.09.15
Revised F/W ver. Remark
1.0
6.3.10 P Head Connecting Hook
Work procedures
1. Remove the following covers.
• Front cover R
• Under cover R
2. Remove the switching base of head connecting. (screw x2)
3. Remove P head lock solenoid assy from the switching base of
head connecting. (screw x2, spring pin x1)
Turn the main power OFF when turning the power OFF. It is very dangerous if sleep mode functions
mistakenly during the operation.
Switching base of head connecting
P head lock solenoid Assy
Spring pin