2. Installation and Connection
4. Push up the arm stopper and tighten the screen loosened in Step 2.
Now the server is installed in the rack.
The following shows how to connect cables to cable arm. Confirm that no tension is applied to cable. See the
figures below.
Image of cable routing
(1) When the server is pulled out from rack
Confirm that no tension is applied to
cable when the server is pulled out
from rack.
Express5800/A1040b, A2040b, A2020b, A2010b User's Guide
230