EasyManua.ls Logo

NEC express5800 A2010b - Page 231

NEC express5800 A2010b
491 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. Installation and Connection
Chapter 2 Preparations
(2) When the server is seated in rack (1)
(3) When the server is seated in rack (2)
Confirm that no tension is applied to
cable joint when the server is seated
in rack.
Secure the repeat tie.
Curve these portions of cable so that
tension is not applied to cable when
cable arm is opened or closed.
Express5800/A1040b, A2040b, A2020b, A2010b User's Guide
231

Table of Contents

Related product manuals