PROGRAM MENU
Note: It is impossible to set the same Condition program for two different programs.
Rad Sum / VPD Sum: Choose whether irrigations can be triggered by the radiation or VPD sum. The
specific Rad Sum trigger is specified per period (see Rad Sum Li.
). ). If irrigation is not triggered due to
Rad/VPD Sum until Max time has elapsed irrigation will be performed due to Max time.
Note: When choosing Rad/VPD Sum the screen will be split in two. To view the day sequence, press the Down
arrow on the bottom part of the screen.
Start time (hh:mm): ENTER up to six start times (periods) per day for each program.
Clock Start: Set the number of time-based irrigation cycles that will be performed in this cycle. The first cycle
starts at the specified start time; subsequent cycles will start after the specified Min. Time.
Cond. Starts (appears only when Cond. Is selected): On/Off.
On: Irrigations can be triggered by the Condition program, when the specified Condition program
settings are met (Condition program active).
Off: Irrigations will not be triggered by the condition program, regardless of the Condition program
status.

Table of Contents

Other manuals for Netafim nmc-pro

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Netafim nmc-pro and is the answer not in the manual?

Netafim nmc-pro Specifications

General IconGeneral
BrandNetafim
Modelnmc-pro
CategoryController
LanguageEnglish

Related product manuals