3. Return the server to operation.
a. Install the server top cover.
See Install the Server Top Cover.
b. Return the server to the normal rack position.
See Return the Server to the Normal Rack Position.
c. Reconnect the power cords to the server power supplies, and power on the server.
See Powering On Oracle Database Appliance.
d. Verify that the System OK LED indicator is lit.
Note:
If the service processor is configured to synchronize with a network time
server using the Network Time Protocol (NTP), the Oracle ILOM SP clock is
reset as soon as the server is powered on and connected to the network.
Otherwise, proceed to the next step.
4. If the service processor is not configured to use NTP, you must do one of the following:
• Reset the Oracle ILOM clock using Oracle ILOM CLI or web interface.
Refer to Oracle ILOM Documentation.
• Use the BIOS Setup Utility to reprogram the host clock.
See BIOS Setup Utility Menus.