REAR SUSPENSION/TRACK/TRACTION
7.27
Pressurize the shock reservoir, through the pres-
sure valve, with nitrogen gas to the specified pres-
sure. (PICTURE 29)
If using Ryde FX inflation tool Refer to Procedures
for use of replaceable inflation Needle instruction
manual found in Ryde FX Inflation Tool case.
NOTE: -- Depending on which shock absorber is be-
ing worked on, adjust the gas pressure the specified
value indicated in the shock specification chart lo-
cated (TBD) service manual.
After being compressed ,the piston rod should be
fully extended from the shock body once the shock
has been pressurized.
Install the small button head screw in the pressure
valve assembly and tighten securely. (PICTURE
30)
29
30
Enfocus Software - Customer Support