4
Manual No. 016-3001-015 Rev. C 33
Initial Set Up and Navigation
9. When the Program Selection Menu screen displays, select the Air Seeder option to restart the Viper Pro
application. The CAN Initialization Results screen will display again.
10. Verify that the appropriate control channels are displayed.
11. If the air cart node will be the only node used to control product application with the OmniSeed system,
select the Start Viper option to begin the air seeder control system. If a product controller node will be used
to control application of liquid product(s), refer to the Configuring the Product Controller Node section on
page 35 to configure an optional product controller node.
Restore Control Channels. If control channels are disabled, use the following procedure to re-reconfigure the
air cart node for changes to the air seeder system.
Note: If an optional product controller node is connected to the CANbus network, it is recommended to
remove the product controller node and configure the air cart node independently with the
following process.
1. Power up the Viper Pro field computer select the Start Viper option on the CAN Initialization Results
screen.
2. From the Viper Pro main screen, touch the Product Control button in the lower, left corner of the Viper Pro
display.