4
Manual No. 016-3001-015 Rev. C 35
Initial Set Up and Navigation
8. When the Program Selection Menu screen displays, select the Air Seeder option to restart the Viper Pro
application. The CAN Initialization Results screen will display again.
9. Verify that the appropriate control channels are displayed before touching the Start Viper button. Review
the Disable Control Channels section on page 31 to disable control channels on the air cart node.
Configuring the Product Controller Node
The optional product controller node may be added to the OmniSeed system to control liquid product
application during seeding operations. When adding the product controller node to the Raven CANbus, the
network may need to be readdressed to properly detect and address the node on the network.
Note: Make sure that the air cart node is properly configured before connecting the product controller
node to the CANbus network.
1. Power up the Viper Pro field computer.
2. If the product controller node requires a readdress, the Viper Pro will display the following prompt.
3. Touch Yes. The Re-Address CAN Nodes screen displays.
4. Cycle power to the air cart node.
Note: To power cycle a node, temporarily disconnect the 5 amp logic power fuse located on the air cart
node cable.
5. Touch the Next button on the Viper Pro to re-address the product controller node. Remove the 5 amp logic
power fuse located on the product controller cable.
Note: If the OmniSeed system will be used with a Raven AccuFlow™ system, the anhydrous system
must be assigned to product channel 4 on the Viper Pro to ensure valve shut off is performed
correctly using the switch box inputs.