EasyManuals Logo

Shimadzu GC-2014 Service Manual

Shimadzu GC-2014
98 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #35 background imageLoading...
Page #35 background image
Chapter 2 Configuration of GC-2014
GC-2014 Service Manual
31
2.3.5 PCB Key Assembly: Functional Block Diagram
Fig. 2.3.4 PCB Key Assembly: Functional Block Diagram
Key
The key is pressed.
Key signal
Voltage
conversion
PCB key ASSY
CPU unit
The CPU performs detection
at regular intervals.
Window signal
Contrast adjustment

Table of Contents

Other manuals for Shimadzu GC-2014

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Shimadzu GC-2014 and is the answer not in the manual?

Shimadzu GC-2014 Specifications

General IconGeneral
TypeGas Chromatograph
DisplayLCD
Maximum Heating Rate120°C/min
Data AcquisitionDigital
Maximum Number of Detectors4
WeightApprox. 45 kg
Carrier GasHelium, Nitrogen, Hydrogen
Detector OptionsFID, TCD, ECD, FPD
Injection PortSplit/Splitless, On-column
Gas ControlElectronic Flow Control (EFC)
Temperature Programming Rate0.1 to 120 °C/min
Power Requirements230 V AC, 50/60 Hz
Detector Temperature RangeUp to 400°C (depending on detector type)

Related product manuals