EasyManua.ls Logo

SICK MARSIC300

SICK MARSIC300
104 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
Cable duct
7
Foam insulation
8
Finished assembly
4. Screw counter nut tight on the cable gland.
5. Unscrew cell cover and remove.
CAUTION
Hot parts in cell.
b
Let cell cool down before working on the cell.
6. Remove protective cap from sample gas line.
7. Insert sample gas line to stop in the clamping ring screw connection on the cell.
With 2 sample gas lines: Observe inlets:
°
Right inlet: Measuring point 1
°
Left inlet: Measuring point 2
8. Screw sample gas line tight on the clamping ring screw connection.
9. Attach red foam insulation on the clamping ring screw connection and bind
together with a cable clip. No thermal bridges may remain.
10. Close cell again.
11. Screw cable gland tight.
12. Push electric lines downwards through the cable duct.
13. Connect power supply of the sample gas line:
TUBE 1
100
100
gnge
sw 2
sw 1
sw 3
sw 4
sw 5
sw 6
PT100 I
PT100 II
Heizkreis I
FILTER 1 PROBE 1 FILTER 2 PROBE 2TUBE 2 TUBE 3
Figure 9: Power supply connection
Complete description of the interface on page 82.
b
Connect the optional second sample gas line (TUBE 2).
NOTICE
The connections on MARSIC300 must match the connections of the gas sampling sys‐
tem.
14. Connect Pt100 of the sample gas line:
INSTALLATION 2
8017585/YXD9/V3-1/2017-05 | SICK T E C H N I C A L I N F O R M A T I O N | MARSIC300
15
Subject to change without notice

Table of Contents

Other manuals for SICK MARSIC300

Related product manuals