Table 4: Data interfaces - overview
Plug Connection for
ETH0 Ethernet (e.g. SOPAS ET), MPR (remote maintenance), communication via
Modbus TCP
ETH1 Internal
USB Internal
SD card SD card (on the right, next to USB)
CAN1 Internal
CAN2 Internal
RS422, RS485 Internal
RS232 (top plug) Internal
O2 (bottom plug) O
2
sensor
DISP (top plug) Display
I/O-MOD (bottom plug) Internal
1
Ethernet cable duct
b
Lead cable through the enclosure duct.
b
Attach shield as shown in the corresponding Figure above.
b
Connect Ethernet to ETH0 (network or computer with SOPAS ET).
Plug type: RJ 45.
b
Connect MPR (remote maintenance via SICK Meeting-Point Router) to ETH0.
Further information, see “MPR Operating Instructions”.
2.14 Installing the gas sampling system
NOTICE
b
Observe the ambient conditions of the gas sampling system: See “SFU Gas Sam‐
pling System Operating Instructions”.
b
Leave the sample gas line and tube bundle cable long enough to be able to pull
the sample gas system out of the exhaust duct.
b
All connections must match the connections in the analyzer (see "Connecting the
tube bundle cable to the analyzer", page 16 and see "Connect the sample gas line
to the analyzer", page 14).
Fitting the flange
b
Install the flange of the gas sampling system as described in the “SFU Gas Sam‐
pling System Operating Instructions”.
°
Observe the 10° tilt of the probe tube during installation.
INSTALLATION 2
8017585/YXD9/V3-1/2017-05 | SICK T E C H N I C A L I N F O R M A T I O N | MARSIC300
25
Subject to change without notice