109
S10.5.2
CHAINS FOR SEALING BAR MOVEMENT AUTOMATISM
(FP6000CS - FP8000CS)
MACHINE STATUS: machine in stop
FREQUENCY: monthly (as required)
REQUIRED MATERIAL: oil and cloth
PROCEDURE:
Check lubrication of the chains (2) for moving the
sealing bar.
S10.5.3 FILM GUIDE ROLLERS
MACHINE STATUS: machine in stop
FREQUENCY: weekly
REQUIRED MATERIAL: oil
PROCEDURE:
Always keep the rollers (3) that guide the film
during the drive phase clean, and oil them if
necessary.