EasyManua.ls Logo

Suzuki RM125 - Installation

Suzuki RM125
252 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FRONT FORK AND STEERING 16-17
INSTALLATION
Install the front fork with the line T aligned with the upper sur-
face of the upper bracket.
Check that the air valve A is positioned at the front.
Tighten the fork lower clamp bolts to the specified torque.
Fork lower clamp bolt: 23 N·m (2.3 kgf-m, 16.5 lb-ft)
Tighten the fork upper clamp bolts to the specified torque.
Fork upper clamp bolt: 23 N·m (2.3 kgf-m, 16.5 lb-ft)
Tighten the fork cap bolt (sub-tank) to the specified torque.
Fork cap bolt: 35 N·m (3.5 kgf-m, 25.5 lb-ft)
09941-53630 : Front fork top cap wrench
Install the handlebars. (16-22)
Install the front wheel. (14-5)
Install the brake caliper. (15-11)
Check that the front fork protectors move smoothly. If not,
loosen and adjust the protector guide.
INSPECTION AFTER INSTALLATION
Front fork (2-20)
Steering (2-22)
Wire, cable and hose routing (18-12, -13, -17)

Table of Contents

Related product manuals