EasyManua.ls Logo

Suzuki RM125 - Oil Replacement

Suzuki RM125
252 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17-6 REAR SUSPENSION
Install the dust seals.
NOTE:
When installing the dust seal, the stamped mark A on the dust
seal must face inside.
Apply grease to the needle roller bearings and install them.
Apply grease to the dust seals and spacers.
Install the spacers A and B.
A for Right side
B for Left side
99000-25010: SUZUKI SUPER GREASE “A”
(or equivalent grease)
OIL REPLACEMENT
TOOLS AND EQUIPMENT
Following tools and equipment are required to perform oil
replacement.
1 Screwdriver or small punch 7 Rags
2 Vise* 8 Nitrogen tank
3 Drain Pan 9 Filler Hose and Nozzle
4 Oilcan 0 Regulator Assembly
5 Beaker A Owner’s Service Manual
6 Specified Shock Oil (SS25)
* Not Shown in the illustration
125

Table of Contents

Related product manuals