EasyManua.ls Logo

Tektronix 2245A - 1 And CH 2 VOLTS;DIV Trace S H Ift; 1 And CH 2 VOLTS;DIV Trace Shift

Tektronix 2245A
194 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Performance Check Procedure
d. Set function generator output for 1 kHz sine-wave signal of five divi
sions peak-to-peak with maximum positive dc offset.
e. Position the bottom of the signal to the center horizontal graticule line.
f. Set CH 1 Input COUPLING to AC.
g. CHECK—display is roughly centered about the center horizontal
graticule line.
h. Move the test signal to the CH 2 input.
i. Set CH 2 VERTICAL MODE to on (CH 1 off).
j. Repeat the procedure for CH 2.
k. Disconnect the test signal from the 2245A.
2. CH 1 and CH 2 VOLTS/DIV Trace Shift
a. Set:
CH 1 and CH 2
VERTICAL MODE On
CH 1 and CH 2
VOLTS/DIV 2 mV
CH 1 and CH 2
Input COUPLING GND
b. Set VERTICAL MODE to CH 1 (CH 2 off).
c. Position trace to center horizontal graticule line.
d. Switch CH 1 VOLTS/DIV through all positions from 2 mV to 5 V.
e. CHECK—trace shift does not exceed 0.2 division between steps.
f. Set VERTICAL MODE to CH 2 (CH 1 off).
g. Position CH 2 trace to the center horizontal graticule line.
h. Switch CH 2 VOLTS/DIV through all positions from 2 mV to 5 V.
l. CHECK—trace shift does not exceed 0.2 division between steps.
2245A Operators 7-11

Table of Contents

Related product manuals