Performance  Check Procedure
g.  CHECK—the  signal amplitude  is between  1.9 and 2.1  divisions.
h.  Repeat the procedure for CH  2.
9.  CH  1  and  CH  2  Vertical  Deflection  Accuracy
a.  Set CH  2  VOLTS/DIV to  2  mV.
b.  Set calibration  generator to  Std Ampl  output,  10  mV.
c.  Position  the  trace  two  graticule  lines  below  the  center  horizontal 
graticule  line.
d.  CHECK—all  positions  of  the  VOLTS/DIV  settings  for correct  signal to 
graticule  accuracy,  using  the  settings  in  Table  7-2,  Signal-to- 
Graticule  Accuracy,  for the  checks.
e.  Set  calibration  generator to  Std Ampl  output,  10 mV.
f.  Move the test  signal to  the  CH  1  input.
g.  Set:
VERTICAL  MODE  CH  1  (CH 2  off)
CH  1  VOLTS/DIV  2  mV
h.  Same as c.  above.
i.  Repeat CHECK procedure  for CH  1.
2245A  Operators
7-15